Engineering for Township Stormwater Approval
We prepare stormwater management plans, infiltration BMP designs, erosion and sediment control plans, and grading and drainage plans for homeowners, builders, contractors, architects, and developers. Each submission is prepared to the governing township ordinance and PA DEP standards, and sealed by a Pennsylvania Professional Engineer.

Services
Engineering Services
Stormwater, grading, and drainage engineering prepared and sealed by a Pennsylvania Professional Engineer, from initial calculations through township approval.
Stormwater Management (SWM) Site Plans & Reports
Calculations and reports prepared to the governing township ordinance and Act 167 watershed requirements, including recharge, volume control, peak rate control, and BMP design.
Infiltration BMP Design
Seepage beds, infiltration trenches, dry wells, and rain gardens sized to ordinance criteria, with drawdown and separation checks.
Soil & Infiltration Testing Coordination
Scoping, witnessing coordination, and interpretation of double-ring infiltrometer and test pit results per township testing standards.
Erosion & Sediment Control Plans
Chapter 102-compliant E&S plans for projects requiring a written plan or Conservation District review.
Grading & Drainage Plans
Lot grading, drainage, and plot plans for building and grading permit applications.
Post-Construction Stormwater Management (PCSM) Support
Assistance for projects requiring NPDES permit coverage.
Operation & Maintenance Plans and Agreements
BMP maintenance plans for recording with the township.
Drainage Problem Evaluations
Investigation of existing drainage, ponding, and runoff issues affecting neighboring properties, with practical solutions.
Township Review Response
Responses to township engineer review letters and plan revisions through approval.